Purpose Supply Continuous Power 24/7 for Seven Years Supporting Construction on one of the Worlds Largest Natural Gas Projects Customer MPower Location Barrow Island, Western Australia Prime Mover MTU 20V400G63L Power 2750 kVA A massive project underway off the coast of Western Australia, building one of the world's largest natural gas projects. The Chevron-operated Gorgon Project is developing the Gorgon and Jansz-lo gas fields. It includes the construction of a three-train, 15.6 million tonnes per annum (MTPA) liquefied natural gas (LNG) facility on Barrow Island and a domestic gas plant with the capacity to provide 300 terajoules per day of gas. Barrow Island is remote, and building the new facility needs power. Contractor MPower is building the power plant to supply this for a scheduled seven year construction period, and has already begun installing twelve generating sets to fill the need. There is no grid supply to Barrow Island so the gensets need to operate in island mode. As well as working in the hot, dry climate, they must also be environmentally friendly as Barrow Island is a Class A Nature Reserve. Project Scope MPower selected STAMFORD | AvK as its alternator supplier for its proven and reliable products, reinforced by its experiences of working together since as far back as 1984. For the Gorgon Project, MPower had specific requirements for staged delivery, DNV Certification and Clean Air Clean Air (CACA) coolers. To provide the 24 MW of continuous power it needed, MPower specified 12 x 2,750 kVA gensets - capable of delivering a total of 33 MW - equipped with MTU 20V400G63L engines and 11 kV AvK DIG 140k-4L alternators. Solutions Development The alternators, supported by CACA coolers and mounted with electric motor driven fans, are rated up to 45°C ambient and can thus cope with the high ambient temperatures typical for Barrow Island. The AvK alternator blueprint features sleeve bearings with oil supply from prime movers with an oil cooling system, AVR with 'black start' capability, vibration probe fixtures for customer vibration monitoring system, and separate 'live' and 'neutral' side terminal box. The entire solution is supplied containerised, accommodating the width and vertical height requirements for the CACA coolers, and meeting the project's quarantine requirements. Each generator is vermin proofed, sealed, managed for condensation and fully cleaned prior to delivery. Customer Satisfaction Working on a large scale project can present many challenges and technical issues, which STAMFORD | AvK has provided reliable, professional technical advice. A prompt flow of information in a timely manner that allowed MPower to progress with the project without any delays. Thanks to STAMFORD | AvK, MPower has been able to supply a power station that can power the entire gas processing plant on Barrow Island during the project's construction and commissioning phase. 12 containerised gensets have been shipped to Barrow Island so far. The Gorgon Project is operated by an Australian subsidiary of Chevron and is a joint venture of the Australian subsidiaries of Chevron (47.3 percent), ExxonMobil (25 percent), Shell (25 percent), Osaka Gas (1.25 percent), Tokyo Gas (1 percent) and Chubu Electric Power (0.417 perecnt). STAMFORD | AvK provided reliable and professional technical advice, allowing progress without any delays MPower Product Datasheet More Product Information This shows our standard model as featured on the product page. Actual customer solutions may vary. AvK DIG140 50Hz Continuous (kVA) 4600.00 60Hz Continuous (kVA) 5300.00 Voltage Range 3300-13800 Voltage Designation Medium/High Poles 4/6 Ingress Protection IP23 Material Insulation Class F Excitation System Auxiliary Winding Winding Pitch 5/6 Related Case Studies Related Case Studies Explore more success stories from STAMFORD | AvK power solutions New Biogas Fuelled CHP Plant Requires STAMFORD HC4 Power Project ScopeSTAMFORD | AvK specified for New Biogas Fuelled CHP Plant. A l... STAMFORD P80 Alternators Power Major Colombian Oil and Gas Site Project ScopeA continuous power requirement in Colombia’s oil sector is bei... STAMFORD S7 Alternators Power 4800kW for Oil and Gas Q Power based in ChangZhou, China have been serving the Oil and Gas industr... STAMFORD-AvK-Alternators-Case-Study-Prime-Power-Island-Mode-MPower.pdf
Product Datasheet More Product Information This shows our standard model as featured on the product page. Actual customer solutions may vary. AvK DIG140 50Hz Continuous (kVA) 4600.00 60Hz Continuous (kVA) 5300.00 Voltage Range 3300-13800 Voltage Designation Medium/High Poles 4/6 Ingress Protection IP23 Material Insulation Class F Excitation System Auxiliary Winding Winding Pitch 5/6